Gold (USD/oz)3,873.10Gold (USD/g)124.52Gold (TZS/g)331,946All mineral pricesas of 18 Nov 2026 · Mining Commission
Projects

Chunya flagship and additional licence interests

A brownfield Gold operation in the historic Lupa Goldfield, with licence interests in the Tanga Region and a new group company for the Mapele area.

Explore

Our Chunya sites at a glance

Tap a site to see a short fact card. On a computer you can also hover.

Chunya District, Mbeya Region · Lupa GoldfieldSchematic · not to scale
Chunya–Makongorosi project (Kasakalawe area) Shanta Gold Mine area 7–8 km 11–13 km
Chunya
Tanzania
  • Project sites
  • 18-PML cluster (Kitete)
  • Shanta Gold Mine area
  • Project area
  • Approximate distance
Existing shafts · main ore source

Kitete

Existing shafts and the main ore source of the Chunya–Makongorosi project (Kasakalawe area, Makongolosi, Chunya District).

  • The site has a long-established history of underground mining that predates Afriglobal. Following the Mining Commission’s camp and site-clearing approval, Afriglobal took over these existing underground workings in November 2025 and has since upgraded them to professional operating standards; the existing shafts were excavated and rehabilitated in September 2026.
  • 1,190 t of ore extracted from November 2025 to April 2026, with no Gold sales in that period (Company records). Stockpile estimated at about 2,000 t (September 2026), not yet surveyed or assayed.
  • PMLs held by the registered licence holder, Mr Yusuf Hassan Mohamed; Afriglobal holds technical-support rights under the Technical Support Agreement.
  • Proposed first phase: development of the Kitete mine — a proposal, subject to financing and approvals.

Read more →

Existing vat-leach facility · proposed plant site

Umoja (Makongorosi)

Site of an existing vat-leach facility at Umoja, Makongolosi (Makongorosi), Chunya.

  • Stockpiled ore will be fed to the existing vats once the crusher and grinder now being mobilised are in place.
  • Proposed 200 TPD CIP processing plant: a proposed first-phase development, not current capacity; subject to financing, an independent Competent Person review, drilling, assays, QA/QC and approvals.
  • OSHA workplace registration No. 203 209 124 (vat-leaching plant) and GCLA registration No. B004-C000788 (chemical storage and user, Umoja), both in the licence holder’s name, Mr Yusuf Hassan Mohamed.
  • NEMC registration of the existing operation (December 2025); audit report, NEMC certificate and EIA for the plant to follow.

Read more →

Technical-support rights over 18 PMLs

18-PML area (within Kitete)

Afriglobal holds technical-support rights over 18 PMLs, all within Kitete, held by the registered licence holder, Mr Yusuf Hassan Mohamed.

  • Technical Support Agreement of 13 November 2025, with addenda of 19 June and 30 September 2026.
  • Technical support on 10 PMLs is authorised by the Mining Commission (MC/TSA/121-2026); authorisation for the other 8 is being sought. Licence copies on file for 15 PMLs.
  • Other PMLs: targeted exploration after title and technical confirmation.

The PML map below is drawn from the licensed corner coordinates. The licences are fully certified by the Mining Commission.

Read more →

Group company · AfriGlobal Group Limited

Mapele

Within the Shanta Gold Mine area of Chunya District, Mbeya Region, through the group company AfriGlobal Group Limited (Certificate of Incorporation No. 210603107).

  • Three main shareholders: Afriglobal Resources Limited, Mr Yusuf Hassan Mohamed and the new investor Earth Hunters Limited.
  • AfriGlobal Group Limited is the technical supporter to the holder of PML001008SWZ under the Main Agreement of 24 September 2026, signed by all parties.
  • The Technical Support Agreement is being prepared for registration with the Mining Commission.
  • No resource is declared for Mapele.

Read more →

Approximate distances: Kitete to Umoja 7–8 km; Mapele to Umoja 11–13 km. The 18 PMLs are within Kitete; Umoja lies outside them.

Schematic, not to scale: it shows how the sites are grouped, not their surveyed positions or directions. EMJ Company Group’s July 2026 reports are consultant site-inspection reports, not independent verification. An independent Competent Person review, exploration drilling, assays and QA/QC are still to be completed; no grade or Mineral Resource has yet been declared.

Portfolio

Licence portfolio map

Indicative locations of our four project hubs. Official Mining Commission cadastral polygons can be loaded on the map. No JORC or NI 43-101 mineral resource is declared.

Open the map full screen →

You’re welcome to visit our sitesInvestors and partners can visit Chunya and our other sites by appointment, guided by our team.
Plan a visit →
Flagship

Chunya–Makongorosi Gold Project

Kasakalawe area, Makongolosi, Chunya District, Mbeya Region. A brownfield Gold operation with a long-established history of underground mining, taken over and operated by Afriglobal since November 2025.

Location and access

The project lies in the historic Lupa Goldfield of south-western Tanzania, about 50 km south-west of Chunya town and about 130 km from Mbeya City. EMJ Company Group reports good road access to the sites.

Mineral rights

The Primary Mining Licences (PMLs) are held by the registered licence holder, Mr Yusuf Hassan Mohamed, who also serves as Site Manager. Afriglobal holds technical-support rights over 18 PMLs under the Technical Support Agreement of 13 November 2025 and its addenda of 19 June and 30 September 2026. Technical support on 10 PMLs is authorised by the Mining Commission (MC/TSA/121-2026); authorisation for the other 8 is being sought. Licence copies are on file for 15 PMLs. Proposed first-phase expansion: development of the Kitete mine and a proposed 200 TPD CIP processing plant at Umoja (Makongorosi). This is a proposal, not current capacity; it is subject to financing, an independent Competent Person review, exploration drilling, assays and QA/QC (all still to be completed), and approvals. Project financing for this phase is being sought.

Project sites

  • Kitete: existing shafts and the main ore source.
  • Umoja: site of an existing vat-leach facility.
  • Other PMLs: targeted exploration after title and technical confirmation.
Licence map of the 15 Chunya PMLs with certificates on filePlotted from licensed corner coordinates
15PMLs mapped
115.82hectares in total
10with Mining Commission authorisation
  • Items 1–10 Technical Support Agreement of 13 November 2025 · Mining Commission authorisation MC/TSA/121-2026
  • Items 11–12 Addendum of 19 June 2026 · Mining Commission authorisation being sought
  • Items 16–18 Addendum of 30 September 2026 · Mining Commission authorisation being sought
Licence map of the 15 PMLs with certificates on file (115.82 ha), compiled by the Company from the licensed corner coordinates. The licences are fully certified by the Mining Commission.

Kitete PML portfolio map

Satellite overview of the 18 PMLs covered by our technical-support rights at Chunya–Makongorosi, shown as numbered areas 1 to 18 (map centre about 8.4415° S, 33.2185° E).

Tap a number on the map, or choose one below, to see that PML’s details.

Satellite map of the 18 Kitete PMLs at Chunya–Makongorosi, numbered 1 to 18, with yellow boundary lines, calculated areas and a PML reference key
Afriglobal Resources – Kitete PMLs: 18 PML areas plotted from 80 licensed corner points. Prepared 3 October 2026. Boundaries follow the licensed corner coordinates. The licences are fully certified by the Mining Commission. Imagery: Esri World Imagery (Source: Esri, Vantor, Earthstar Geographics, and the GIS User Community); acquisition may predate current site activities.

Select a PML number to see its licence reference, calculated area and our role.

Download map (PDF)View full size (opens in a new tab)

PML reference key: 18 PMLs with calculated areas
Kitete PML reference key, map numbers 1 to 9; areas calculated from licensed corner coordinates
No.PMLArea (ha)
01PML 00585 CHY7.89
02PML 005869.02
03PML 00590 CHY2.44
04PML 00807 CHY6.58
05PML 00808 CHY8.46
06PML 00809 CHY4.70
07PML 00810 CHY8.46
08PML 008117.24
09PML 00009199.02
Kitete PML reference key, map numbers 10 to 18; areas calculated from licensed corner coordinates
No.PMLArea (ha)
10PML 00009208.46
11PML 00886 CHY9.87
12PML 00992 CHY6.81
13PML 01813 CHYPML303430/CHY7.61
14PML 01814PML303432/CHY9.82
15PML 01815 CHYPML300785/CHY8.36
16PML 352967/CHY10.62
17PML 353194/CHY9.77
18PML 353201/CHY9.77

Areas are approximate WGS84 geodesic calculations from the licensed corner coordinates. The licences are fully certified by the Mining Commission. Numbers 1–18 are reference numbers on this map.

Current operations

The Kitete shafts are long-established underground workings that predate Afriglobal’s involvement. Following the Mining Commission’s camp and site-clearing approval, Afriglobal took over these workings in November 2025 and has since upgraded them to professional operating standards. The Company recorded 1,190 t of ore extracted from November 2025 to April 2026, with no Gold sales in that period. Production and shaft rehabilitation continued from May to September 2026, and in September 2026 the existing shafts were excavated and rehabilitated to a modern standard.

Ore is stockpiled for processing. The Company estimates the stockpile at about 2,000 t (September 2026); this estimate has not yet been surveyed or assayed. The ore will be fed to the existing Umoja vats once the crusher and grinder now being mobilised are in place.

Excavator rehabilitating existing shafts, Chunya
Shaft excavation and rehabilitation, Chunya, September 2026.
Shaft headframe and winch at Kitete
Existing shaft headframe, Kitete (EMJ site visit, July 2026).
Ore stockpile at Kitete
Ore stockpile, Kitete (EMJ site visit, July 2026). Photographs do not evidence mineralisation or grade.

EMJ Company Group’s July 2026 reports are consultant site-inspection reports, not independent verification. Mining and ore extraction to date do not confirm grade. An independent Competent Person review, exploration drilling, assays and QA/QC are still to be completed; no grade or Mineral Resource has yet been declared.

Group company

Mapele, Chunya, through AfriGlobal Group Limited

A new group company for the Mapele area, within the Shanta Gold Mine area of Chunya District, Mbeya Region.

As part of its expansion, Afriglobal Resources Limited has incorporated AfriGlobal Group Limited (Certificate of Incorporation No. 210603107, 23 September 2026, under the Companies Act, 2002). At Mapele, AfriGlobal Group Limited has three main shareholders: Afriglobal Resources Limited, Mr Yusuf Hassan Mohamed and the new investor Earth Hunters Limited.

Under the Technology Partnership Investment Agreement (Mining Technical Support) Main Agreement dated 24 September 2026, AfriGlobal Group Limited is the technical supporter to the holder of Primary Mining Licence PML001008SWZ. The agreement has been signed by all parties, and the Technical Support Agreement is being prepared for registration with the Mining Commission.

No resource is declared for Mapele.

Site camp and access road at Mapele
Site camp and access road, Mapele (September 2026).
Existing shafts and pits at Mapele
Existing shafts and pits, Mapele (September 2026).
Active PMLs

Ngeze, Kilindi District, Tanga Region


The Company operates two Primary Mining Licences at Ngeze under an investment and operating agreement of 23 October 2025, with a term of 10 years:

  • PML 1314TNG (about 9.45 ha)
  • PML 1315TNG (about 9.38 ha)

Both were granted on 1 April 2022 for seven years and remain registered to their holders. Current work is vat leaching of existing tailings: 3,000 t of tailings were handled from January to April 2026 (Company records).

Field inspection at Kilindi
Field work, Kilindi District (Company photo).
Granted licences

Manga (Tengwe area), Handeni District, Tanga Region

Afriglobal Resources is the holder of 10 Gold Primary Mining Licences in Handeni District, Tanga Region. Licence fees fully paid; licences fully granted.

Afriglobal Resources Limited is the holder of 10 Gold Primary Mining Licences at Manga (PML355698/TNG to PML355706/TNG and PML356125/TNG), acquired under a purchase agreement of 18 September 2026. On 22 October 2026 the Mining Commission issued offer letters for all 10 licences, and the Company paid the government licence preparation fees and first-year rent in full the same day. The licences are now fully granted.

Location

The Company’s geological briefing places the licence block in the Tengwe area of Handeni District. It is a narrow rectangle about 2.5 km east–west by about 270 m north–south, roughly 68 ha, at about 380–450 m elevation, with farmland and bush at surface.

Geological setting

The area lies east of the Lake Victoria Gold belts, in the Kilindi–Handeni terrane of the Usagaran / East African (Mozambique) Orogen: strongly deformed gneiss, amphibolite and granulite. Published research reads parts of this terrane as older greenstone rocks that were later reworked, and Gold in the wider Handeni–Kilindi district is associated with shear zones and quartz veins. Magambazi, about 33 km to the west, is a known Gold occurrence in the same district. It is not an Afriglobal property and is mentioned here only as regional context.

Status of work

The block is prospective and untested. The briefing found no published drill hole, soil survey or assay from inside these corners. It recommends a staged approach: title checks, geological mapping and review of Geological Survey of Tanzania maps and airborne data, then soil sampling and trenching, before any drilling.

Government exploration

The Manga area is currently under government exploration, which is expected to provide verified data covering Afriglobal Resources’ PMLs and the Najim & Company Limited PL.

Licences held

PML355698/TNG · PML355699/TNG · PML355700/TNG · PML355701/TNG · PML355702/TNG · PML355703/TNG · PML355704/TNG · PML355705/TNG · PML355706/TNG · PML356125/TNG

Block coordinates (WGS84)

Centre about 5.8306° S, 38.2549° E.

Manga (Tengwe area) licence block corner coordinates, WGS84
CornerLatitudeLongitude
P1NW05°49′45.69″ S−5.829358038°14′36.59″ E38.243497
P2NE05°49′45.69″ S−5.829358038°15′58.59″ E38.266275
P3SE05°49′54.46″ S−5.831794038°15′58.59″ E38.266275
P4SW05°49′54.43″ S−5.831786038°14′36.59″ E38.243497

View the outline on Google Maps (opens in a new tab) Download outline (KML)

Outline of the Manga (Tengwe area) licence block, drawn to scale from the four licensed corner coordinates: about 2.5 km east-west by 270 m north-south. P1 P2 P3 P4 about 68 ha · 2.5 km × 270 m 500 m N
Block outline drawn to scale from the licensed corner coordinates (north at top). The licences are fully certified by the Mining Commission.

Location, geology and coordinates are taken from a desktop geological briefing dated 24 September 2026, prepared for the Company. It is not a Competent Person’s report. No grade, Mineral Resource or Ore Reserve is declared for this block, and no mining or processing plan has been set. The licences are fully certified by the Mining Commission. The briefing and a small-scale exploration field guide for Manga Ward are available to qualified parties on request.

Why Chunya

An established goldfield with infrastructure at site

An established goldfield

Chunya District lies in the Lupa Goldfield, a long-established Gold-mining area with active small-scale and larger operations, including Shanta Gold’s New Luika mine.

Infrastructure at site

EMJ’s July 2026 inspections report grid electricity accessible at Umoja, a borehole and nearby water source, good road access and an existing vat-leach operation. These are the consultant’s site-inspection findings, not independent verification.

Incentives in place

TIC Certificate of Incentives No. 2025103132, with an implementation period from 17 October 2025 to 16 October 2028.

Room to grow

The 18 Chunya PMLs and the Mapele area give the Company and its group a base for growth in one goldfield, subject to title, technical confirmation and Mining Commission approvals.

We welcome you to visit our site in Chunya

Investors, lenders and their technical advisers are invited to inspect the Kitete shafts, the ore stockpiles and the Umoja vat-leach facility, and to meet our team. We will arrange site access and logistics at a mutually convenient date.

WhatsApp us